It's Thursday night. Payroll is due, and you're still chasing time sheets.
If you've run payroll for a construction company, you know the feeling. You probably know it every week.
The weekly cleanup
Missing hours. Wrong jobs. Cost codes nobody remembers.
Every week, the payroll clerk ends up cleaning up the field's paperwork. Calling foremen. Guessing which job a man was on Tuesday. Moving hours from one cost code to another because the one on the sheet doesn't exist anymore.
That's not payroll. That's detective work. And it's the same story every week.
Why the field turns it in late
It's easy to blame the field. But think about it from the crew's side.
To them, a time sheet is paperwork. It doesn't help them do the job. It doesn't tell them anything. Nobody looks at it except the office, and the only feedback they ever get is a phone call when something's missing.
So it waits until the end of the week. Then it gets filled out from memory, in the truck, in a hurry.
Reminders won't fix it
Reminders and nagging won't fix it. I tried. Every company has tried.
What fixes it is a reason. Something that makes entering time right worth it to the person entering it.
Give the crew a reason
PayCrew gets every employee entering time daily, with daily feedback on production and incentives that give them a reason to get it right.
When a crew member enters his time and the crew's quantity at the end of the day, he sees the score. Units per man-hour, against the goal. Green or red. That's information he cares about.
When labor savings fund incentives, accurate time is worth money to him. Wrong job or wrong cost code means his crew's score is wrong. Now he wants it right.
Three things that change
With that focus, the time coming in is:
- Accurate. The right job and the right cost code.
- Timely. Entered every day, not rebuilt at the end of the week.
- Consistent. Crews trained on their daily goals, so they enter it the same way every day.
Payroll becomes a breeze
With daily entry and daily approval, payroll is a breeze on Monday morning, or whatever day you process it.
The hours are already in. The foremen already approved them while they remembered the day. The cost codes already match the job. The payroll clerk reviews instead of rebuilding.
If you run Foundation accounting, approved, payroll-ready time can go there the same day. See Foundation time sync.
Approve it the same day
Daily approval is the other half. A foreman who approves his crew's time at the end of the day knows who worked where and on what. He catches the wrong cost code before it leaves the jobsite. A foreman approving a week of time on Monday morning is guessing too, just faster.
Make same-day approval part of the foreman's job, and measure it. When approvals happen daily, the payroll clerk's Thursday night gets a lot shorter.
And when the crew sees the score as soon as they enter, the time comes in before they leave the site.
What the clerk gets back
Ask any construction payroll clerk what they'd do with an extra day each week. Most would say they'd finally get ahead on the things that keep slipping: job cost reviews, vendor questions, cleaning up old records. Daily time gives them that day back.
Better than payroll
Clean time does more than make payroll easier. The same data feeds job cost, the WIP statement and your next estimate. Read month-end starts on Tuesday.
And your payroll clerk gets to stop being a detective. That's worth a lot too.


